Product Category
Forwell Quick Die Change System|| Automated star!
QMCS for Plastic Injection [ 2003.12.16 Economic Daily ]
[ Reported by Ren Yi Chang / Chunghua ]
Rigorous development these years in the 3C industry has attracted many investors to set up factories for plastic mold injection. Prices are dropping and competition is fierce given unprecedented amounts of orders coupled with unequalled demands for quality. Product lifecycles are short, promising sustained business, but only for those who can meet the mark of quality, beat contending prices, and still manage to make a profit. The trick to survival is to be set up with automated quick mold change systems.
Everyone in the plastic mold injection business has the potential to flourish with orders from the 3C industry, given one can handle small orders and wide diversity. Deadlines seem to dictate these days, so having a reputation for punctual delivery is essential. Quick mold change systems (QMCS) serve a variety of functions. Mold change time diminishes, stock is reduced, re-tooling eradicated, mold life extended, and labor costs reduced. The QMCS promise to give manufacturers a fighting chance in a market where flexibility dictates.
President of Forwell Precision Machinery Co., Ltd With competition evolving as fast as it is among those in industrial circles, changes in the economy, international trade restrictions and overall trends towards self preservation in business, the rules of the game are getting tighter all the time. As far as plastic injection is concerned, advanced countries have already taken measures in automation and ergonomics to save labor costs, yielding results that have spurred innovation in Taiwanese manufacturing. Specifically, Forwell's QMCS run pneumatically. Servo pumps govern pressure, where boosts kick in at appropriate intervals and ample reserves allow for prolonged operations and continued processing in the event of power outages. The convenience provided as well as added economical benefits of extended mold lifespan, safety, etc. are exactly what serious shops are seeking in terms of quality.
Fast change, same business's competition during international trade protects oneself, to suppose limits and so on many factors, urges revertex projecting industry to propose facing the severe strength competition, already invests in the advanced countries reduces effort to melt, the automation and nobody melts, also attains the good achievement, is worth the domestic industry reference. But projecting machine fast trades the mold system is has the high oil pressure using the air pressure actuation pump, reaches when the turbo-charged multiple by the air pressure-regulating valve adjustment pressure then stops actuating, when the temporary power cut or the air pressure vanish, the flowing tubing head pressure pressure still could the long time maintain, especially was suitable the long time high flowing tubing head pressure pressure maintenance, had the province energy, the security, the economy, the convenience lengthens the mold life and so on many merits, promptly achieved the field pursued the high quality the request.
Copyright © Forwell Precision Machinery Co., Ltd. / TEL: +886-4-8345196 / FAX: +886-4-8345197
No.399, Sec. 2, Mingsheng Rd., Pusin Township, Changhua County 513, Taiwan (R.O.C.)